571. FAQ  
Double-walled units within the meaning of AwSV Section 2 (17) consist of two independent walls. The space between them is equipped with a leakage indicator system, which shows leaky points on the in  
572. FAQ  
Double-walled units within the meaning of AwSV Section 2 (17) consist of two independent walls. The space between them is equipped with a leakage indicator system, which shows leaky points on the in  
573. FAQ  
Double-walled units within the meaning of AwSV Section 2 (17) consist of two independent walls. The space between them is equipped with a leakage indicator system, which shows leaky points on the in  
574. FAQ  
For double-walled units within the meaning of AwSV, no collection trays are required – – otherwise, the following applies: Mixtures that may containing water-polluting substances and leak in  
575. FAQ - Installation  
Installation  
576. FAQ  
According to TRbF20, the storage of flame-retardant liquids of hazard class AIII (flash point above 55°C) and of non-flammable substances does not require notice nor approval.  
577. FAQ  
Units with a capacity of more than 1,000 litres must be inspected by a qualified professional prior to commissioning. Up to a unit capacity of 10 m³, there is no need for the inspection as long as t  
578. FAQ  
Units up to a capacity of 10,000 litres do not require repeated inspection (5 m³ in water protection areas). Units with a capacity of more than 10 m³ (content of all containers) require inspection b  
579. FAQ - Approval / Inspection  
Approval / Inspection  
580. FAQ - Operation / maintenance  
Operation / maintenance  