Inspection and testing of IBCs
Rechtliche Grundlagen zu Inspektion und Prüfung
- Unterstützung in Produktionsprozessen
- Verpacken der Ware
- operative Verantwortung für die Anlage & Fachliche Führung eines kleinen Teams
- Einrichtung & Inbetriebnahme der Anlage
- Gute Deutschkenntnisse erforderlich
- Versorgung der Arbeitsplätze mit Material
- Be- und Entladen der LKWs
- Staplerschein notwendig
- Durchführung von Produktprüfungen
- Kontrolle der Personal- und Betriebshygiene und Überwachung der Metalldetektoren
- Bereitschaft in Wechselschicht zu arbeiten
All IBCs, counting from the date of the first (factory) test, must undergo repeat tests every 2 ½ years, namely:
Inspection after 2½ years
By a level II inspection body registered with the BAM, pursuant to BAM-GGR 002 – Part B, Paragraphs B 1.2.1, B 2.1 and B 3.1
- Inspection of the external condition
- Inspection of the identification marking
- Test of the function of the operating equipment, i.e. all fittings belonging to the container
- Leak test using air at 0.2 bar excess pressure
Inspection after 5 years
By a level I inspection body registered with the BAM, pursuant to BAM-GGR 002 – Part A, Paragraphs A 1.2.1, A 2.1 and A 3.1
- In addition to the scope of the inspection after 2 ½ years, the following shall be carried out:
- Checking concordance with the model type
- Internal inspection
Any repair work arising and assembly materials needed are charged based on time and cost. On request we will prepare a cost estimate for you beforehand.
count. ContainerManufacture no:
Manufacture no.*
Residual quantity (litres)
Liquid
Upload up to 2 photos in jpg format here.
(Leakage liquid* filled up to the filling mark or the vacuum leak indicator in the green area)
Yes No
(e.g. completely or partially illegible, stamp fields full)
Yes No
(e.g. leaking liquids on or around the tank, cracked weld seams)
Yes No
(e.g. crane lugs or base plates deformed/cracked, dents on the tank wall)
Yes No
(e.g. pump defective/leaking, hoses or connections porous/cracked or leaking, safety valve defective or missing)
Yes No
count. ContainerManufacture no:
Manufacturer*
Container type
Manufacture No.*
Type approval
We require the type approval in advance for third-party containers in order to ensure proper testing and inspection.
DO YOU NEED HELP?
- Unterstützung in Produktionsprozessen
- Verpacken der Ware
- operative Verantwortung für die Anlage & Fachliche Führung eines kleinen Teams
- Einrichtung & Inbetriebnahme der Anlage
- Gute Deutschkenntnisse erforderlich
- Versorgung der Arbeitsplätze mit Material
- Be- und Entladen der LKWs
- Staplerschein notwendig
- Durchführung von Produktprüfungen
- Kontrolle der Personal- und Betriebshygiene und Überwachung der Metalldetektoren
- Bereitschaft in Wechselschicht zu arbeiten
If there are any questions regarding the enquiry, we will be happy to help you. Feel free to give us a call or send us an email.