+49 5244 983-200
rietbergbehaelter@seppeler.de
To the inquiry form
To the configurator
To the showroom

REPAIRS, MAINTENANCE OR ASSEMBLY of IBCs

Manufacture no.*
Residual quantity (litres)
Liquid
Photo of the name plate
Upload up to 2 photos in jpg format here.
Add photo
1. Is the leak detection system externally intact?
(Leakage liquid* filled up to the filling mark or the vacuum leak indicator in the green area)

Yes No
2. Is a new nameplate required for the tank?
(e.g. completely or partially illegible, stamp fields full)

Yes No
3. Are there any obvious leaks on the tank?
(e.g. leaking liquids on or around the tank, cracked weld seams)

Yes No
4. Are there any dents or deformations on the tank?
(e.g. crane lugs or base plates deformed/cracked, dents on the tank wall)

Yes No
5. Is the operating equipment damaged or defective?
(e.g. pump defective/leaking, hoses or connections porous/cracked or leaking, safety valve defective or missing)

Yes No
Manufacturer*
Container type
Manufacture No.*
Type approval
Type approval upload (pdf)
We require the type approval in advance for third-party containers in order to ensure proper testing and inspection.
  • Service
  • Contact details
  • Place of operation
  • Container data
  • Maintenance interval

(Please fill in all fields marked with *)

What services do you want to use?
Inspection and testing of IBC
Repair, maintenance or installation
Your contact details
New customers Existing customers
Company Name*
First Name*
Surname*
Street*
No.*
Postcode*
Town/City*
Country
Telephone*
EMAIL*
Your order reference
Customer number
VAT ID no.
Place of operation
at your location
at Seppeler Container Service
Container data
Rietberg container

Information on our in-house containers

Third-party containers

Information on containers from other manufacturers

Maintenance interval

Is a regular Rietberg container service requested?

At what intervals would you like the service?

Complete registration
Your message to us
Yes, I have read and agree to the privacy policy.*
Keep up to date! With our newsletter we tell you about current developments in the industry and new solutions from our company.
Please note that the results of the last inspection and testing must be presented. A test report on each inspection and testing must be kept by the owner of the IBC until at least until the next inspection and testing.
Captcha *
captcha

DO YOU NEED HELP?

  • Unterstützung in Produktionsprozessen
  • Verpacken der Ware
  • operative Verantwortung für die Anlage & Fachliche Führung eines kleinen Teams
  • Einrichtung & Inbetriebnahme der Anlage
  • Gute Deutschkenntnisse erforderlich
  • Versorgung der Arbeitsplätze mit Material
  • Be- und Entladen der LKWs
  • Staplerschein notwendig
  • Durchführung von Produktprüfungen
  • Kontrolle der Personal- und Betriebshygiene und Überwachung der Metalldetektoren
  • Bereitschaft in Wechselschicht zu arbeiten

If there are any questions regarding the enquiry, we will be happy to help you. Feel free to give us a call or send us an email.